Experience Promstroi Group of Companies:

 

 

 

Key projects

- ongoing projects
- completed projects

Ongoing projects

Project
Client
Type of works
Combined Oil Refining Unit Euro+ TECNIMONT
Technimont Russia
General construction works, corrosion protection system, structural steel erection, prefabrication and installation of process pipelines, mechanical installation works.
Construction of Polypropylene production plant of 500 thousand tons annual capacity ZapSibNeftekhim (SIBUR) General contract works. Foundation works, pouring of cast-in-situ concrete, erection of precast concrete, metal structures, installation of underground pipelines (including access manholes, cathodic protection, inplugging, testing under pressure and reassembly), above-ground pipelines (including pressure testing), main equipment and pre-commissioning activities.
Construction of temporary rotational camp, field offices and workshop for application of fire retardant paint including general construction and mechanical installation works ZapSibNeftekhim (SIBUR) General construction, mechanical-installation, electrical-installation and commissioning.
III construction phase of Antipinsky Oil Refinery CJSC. The forth start-up complex. Title 204. Diesel fuel hydrotreating unit. Antipinsky Oil Refinery Contract works. Civil construction, installation of metal structures, equipment and industrial pipelines, special works (automation, electrical installation works and other special works), procurement.

Completed projects

Project
Client
Type of works
Completion of works
Reconstruction of NGL complex, SIBUR Tobolsk LLC SIBUR Tobolsk (SIBUR) General contract works, civil construction, installation of metal structures, equipment and industrial pipelines, special works (automation, electrical installation works), procurement, commissioning, landscaping. 2016
Construction of landfall facilities and temporary construction facilities at the project «Turkish Stream» South Stream Transport B.V. Civil works, electrical works, insulation, corrosion-resistant coating and erection of temporary buildings and facilities. 2016
Expansion of natural gas liquids processing production No.3 and 6 in Astrakhan Gas Processing Plant. Pentane-Hexane Fraction Isomerization Unit GAZPROMSTROIINVEST
(Gazprom Invest Yug)
Contract works. Full range of construction and installation works (including special works), testing of equipment and pipelines. 2016
Construction of -OPS-4, including externally gas supply facilities» within the project «Expansion of the Caspian Pipeline in the Territory of the RF» Caspian Pipeline Consortium Contract works. Civil construction, installation of metal structures, equipment and pipelines, special works, commissioning. 2016
Alexandrovskoye-Anzhero-Sudzhensk Main Pipeline. Pervomaika Oil Pumping Station

NefteKhimServis
(AK Transneft)

Contract works. Civil construction, installation of metal structures, equipment and industrial pipelines, special works (automation, electrical installation works and other special works), procurement, commissioning, landscaping. 2015
Ethylene oxide and glycol production plant

Sibur-Neftekhim
(SIBUR)

General contract works;
general construction works;
installation of metal structures, equipment and industrial pipelines;
procurement;
landscaping
2014
«Section Gas Fractionation Plant 2» of the project «Expansion of WSLH Processing Plant no less than 5.8 million tons per year»

Tobolsk-Neftekhim
(SIBUR)

General contract works, civil construction, installation of metal structures, equipment and industrial pipelines, special works (automation, electrical installation works), procurement, commissioning, landscaping. 2014
«Yuzhnaya Commodities and Raw Materials Base» within the project «Expansion of WSLH Processing Plant no less than 5.8 million tons per year» Tobolsk-Neftekhim
(SIBUR)
General contract works, engineering works, installation of metal structures, equipment and industrial pipelines, special works (automation and automatization, electrical installation works), procurement, commissioning, landscaping. 2014
Polypropylene Plant Tobolsk-Polymer
(SIBUR)
Power supply, EC&I, commissioning. 2014
Isomerization Complex of Pentane-Hexane Fraction Saratovskiy Oil Refinery
(TNK-BP)
Contract works. Civil construction, installation of equipment, electrical installation works, special works (EC&I, DCS), commissioning, procurement. 2014
Reconstruction of OPS «Astrakhan» within the framework of the project «Expansion of Caspian Pipeline in the Territory of the RF»

Caspian Pipeline Consortium

Installation and dismantling of technological equipment and structures, installation of industrial pipelines, landscaping. 2014
Pokrovskaya Gas Processing Plant Orenburgneft
(Oil Company ROSNEFT)
General contract works, civil construction, installation of metal structures, equipment and industrial pipelines, utility systems, special works, landscaping. 2013
Construction of Kuibyshev – Unecha – Mozyr-1 pipeline section. Bypass of the town of Penza (Penza Region) MN Druzhba
(AK Transneft)
Contract works. Civil construction, installation of pipeline and technological equipment, special works, commissioning. 2013
Production of butadiene styrene thermoplastic elastomers with the capacity of 50000 tons per annum

Voronezhsintezgazkauchuk
(SIBUR)

Civil construction, installation of technological equipment, electrical installation works, special construction works, special works (EC&I, DCS), commissioning, procurement. 2013
Increase in WLHF in Yuzhno-Balykskiy Gas Treatment Plant in the city of Pyt-Yakh

Yuzhno-Balykskiy GTP
(SIBUR)

General contract works, civil construction, installation of metal structures, equipment and industrial pipelines, special works (automation, electrical installation works), procurement, commissioning, landscaping. 2012
Replacement of Final Stage of Yaroslavl – Moscow Main Pipeline, 283-297 km. Technical Re-Equipment

Verkhnevolzhsknefteprovod
(AK Transneft)

Contract works. Civil construction, installation of pipeline and technological equipment, special works, landscaping. 2012
IGS-3. Samotlor oil field. Second start-up complex. Process Control Systems Maintenance. Samotlorneftegaz
(TNK-BP)
General contract works, installation of fire alarm systems, EC&I, electrical heating of industrial pipelines. 2012
Construction of industrial pipelines and installation of technological equipment for oil metering station

MN Druzhba
(AK Transneft)

Installation of technological equipment and pipelines. 2011
Baltic Pipeline System (BPS II). First phase commissioning. Adjustment. Oil Pumping Station No.3

MN Druzhba
(AK Transneft)

General contract works. Civil construction, explosive works, installation of metal structures, equipment, industrial pipelines and trunk oil pipelines, special works, procurement, commissioning. 2011
Main gas pipeline «Sakhalin – Khabarovsk – Vladivostok». Gas Compressor Station «Sakhalin». GazpromInvestVostok
(Gazprom)
Installation of technological equipment and pipelines. 2011
Reconstruction of DCU. First start-up complex. Reconstruction of the unit with the capacity up to 1 million tons. Rominserv-Kazakhstan Reconstruction. Installation of metal structures and pipe spools.  2011
Expansion of Yuzhno-Balykskiy gas processing plant Yuzhno-Balykskiy GTP
(SIBUR)
General contract works, civil construction, installation of metal structures, equipment and industrial pipelines, utility systems, special works, landscaping. 2009
Oil pipeline «Skovorodino – the PRC’s Border» TSUP VSTO
(AK Transneft)
General contract works. Civil construction, explosive works, installation of metal structures, equipment, industrial pipelines and trunk oil pipelines, special works, procurement, commissioning. 2010
Oil transfer and treatment station to main oil pipelines in the Samara Region Samara-Nafta EPCM. Design, procurement, installation and technical expertise management.  2007
First stage of the Eastern Siberia – Pacific Ocean pipeline system. Specialized Oil-Loading Seaport «Kozmino» Specialized Oil Loading Seaport «Kozmino»
(AK Transneft)
Earth works, installation of industrial pipelines and equipment. 2009
Oil Pumping Station Mariinsk-2 of Novosibirsk District Oil Pipeline Agency TSUP Stroineft
(AK Transneft)
General contract works. Civil construction, installation of metal structures, equipment, industrial pipelines and trunk oil pipelines, special works, explosive works, procurement, commissioning. 2006
Operation and Maintenance service facility «Ust-Kut» Vostoknefteprovod
(AK Transneft)
General contract works. Civil construction, explosive works, installation of metal structures, equipment, industrial pipelines and trunk oil pipelines, special works, procurement, commissioning. 2009
Construction of Vertical Steel Tanks with the capacity of 50000 cubic meters in Nikolskoye settlement MN Druzhba
(AK Transneft)
General contract works, civil construction, installation of metal structures, equipment and industrial pipelines, utility systems, special works, landscaping. 2007
Construction of Vertical Steel Tanks No.1 with the capacity of 50000 cubic meters in Storage Park «Lopatino» Privolzhsknefteprovod
(AK Transneft)
General contract works, civil construction, installation of metal structures, equipment and industrial pipelines, utility systems, special works, landscaping. 2009

 

 

 

 

Promstroi Group
of Companies


 

PROMSTROI-GROUP
JSC

Moscow

 
 

Subsidiaries

 

Promstroi
JSC

Nyagan (KMAD)

 

Spetsializirovannoye
Upravlenie No.6
JSC

Stavropol

 

Uralmontazhavtomatika
OJSC

Tyumen

 

KAZMEKHANOMONTAZH
LLP

Republic of Kazakhstan,
Almaty

 

Novopolotsk Metal
Structures Plant
JV LLC

Republic of Belarus,
Novopolotsk

 

Inzhpromstroi
LLC

Blagoveshchensk


Associated
undertakings

GulfPromstroi
Engineering
LLC

Moscow

 

Talspetsstroi
LLC

Nyagan (KMAD)